Bicycle rear rack tube cutting is only one stage in making some luggage racks. A finished rack may combine bent aluminum tubing, short stays, adjustable legs, machined or stamped fittings, welds, a bag interface and mounting hardware. A saw quotation becomes useful when the buyer identifies the straight blanks actually released for cutting, their end conditions and the next operation. The outside size of an assembled rack is not a cut length.
This guide is for rack OEMs and component suppliers comparing an in-house aluminum saw with prepared tube supply. It does not design a rack, approve bicycle compatibility, assign a load rating or replace the product owner’s testing and mounting instructions. If the rack is purchased complete, first confirm whether any separate tube-cutting job remains at your factory.
Why the rack architecture matters before a saw trial
Published products show different ways to make a rear carrier. Topeak’s UNI SUPER TOURIST FAT identifies a hollow aluminum rack and adjustable legs, and it states specific wheel and frame limitations. Topeak’s EXPLORER describes a tubular aluminum rear rack and asks the buyer to check frame eyelet compatibility. Ortlieb’s Quick-Rack product sheet identifies 10 mm aluminum tubes, alternative stay lengths and a separate mounting kit. These examples establish that tube geometry, stays and mounting interfaces vary; they do not reveal the production route or cutting dimensions for another company’s rack.
Keep bicycle-mounted rear luggage racks separate from vehicle-mounted bike carriers. A tray holding a bicycle on a car has different interfaces and should not supply the trial drawing for a bicycle rack. The buyer’s own approved assembly drawing and component list control the present job.
Seven checks for a bicycle rear rack tube cutting RFQ
1. Mark which parts are straight blanks
Give each item a part number, revision, material designation, outside section, wall thickness if controlled, supplied condition, quantity and downstream route. Mark a straight stay as a saw blank only if it arrives long and is cut at this station. A bent upper loop might begin as a straight blank, arrive as a formed component, or be purchased welded into a rack; these are three different quotation boundaries. Do not count the full loop as several saw-cut pieces merely because it has several straight-looking segments after bending.
Separate rack tubing from adjustment sleeves, clamps, platform plates, mounting screws, reflectors, luggage rails and bag-interface parts. If the supplier delivers a complete rack, a machine proposal should be based only on other genuinely retained cutting work. A list of finished-rack photographs cannot substitute for this component-stage bill of materials.
2. Place the cut before or after forming and joining
The drawing must identify the stage of every requested length. A pre-bend straight blank may include a forming allowance; a post-bend trim is measured from a datum on the formed component. Neither length follows directly from the finished rack’s width or height. Let the designer or forming supplier release the developed length and bend sequence. A saw supplier can assess a stated blank or trim operation, but should not invent bend allowance from a catalog image.
Also identify whether the cut face will later be welded, inserted into a fitting, capped, drilled or finished. Those downstream steps can change which edge or face matters in the saw trial. If a welded module arrives complete, excluding it from the saw scope is more accurate than assigning a theoretical cut to it.

3. Specify the real end form and responsible process
For each end, state square, planar angle, or a shaped contour such as a saddle against another tube. Add the orientation and the measurement datum. A circular saw may prepare square or specified planar angled faces within its verified capability; a saddle contour may need a different operation or a separately approved method. Do not use one generic “45-degree tube cut” instruction for all junctions. The release should say which department owns any contouring, deburring, drilling and weld preparation.
Show the mating part and the intended joint in the trial pack. A visually tidy cut does not establish that a stay clears the wheel, aligns with an eyelet, accepts a fastener or fits a bag rail. Those interfaces need assembly-level checks against the actual released design.

4. Resolve left, right and adjustable variants
A rack can have mirrored stays, an alternate upper attachment, or legs selected for different bicycle frames. The Topeak and Ortlieb examples make clear why a buyer should not assume that every apparent stay is one universal length. Create a line for each released variant, including hand, mounting position, end orientation and quantity per rack. If adjustment happens by telescoping, slots or a choice of supplied stays, identify the manufactured cut blank before the adjustment. The assembly team should confirm the adjustment range and hardware, not the saw supplier.
Ask for a labeled first-off set with both hands and all representative variants. A setup that makes an acceptable right-hand part can still produce a left-hand part with the end angle reversed. A simple part label and orientation mark can prevent the wrong part from moving to bending or assembly.
5. Show how the actual stock will be supported
Provide the real tube or extrusion sample, not just its outside diameter. Thin walls, surface finish, curvature already present, or a non-round section can change locating and clamping. Tell the machine supplier where the tube may be contacted and which face must remain free of marks. For long stock, include infeed support and the shortest finished piece in the trial. The trial should inspect whether the part seats consistently and whether cut ends remain accessible for the receiving check.
Do not infer a particular Jiurun model or cutting tolerance from the generic equipment image below. Ask for a configuration review against your section, length range, end orientation, batch size and actual sample. A demonstration on a different profile is useful process context, not qualification of your rack part.

6. Agree the receiving check and the product owner’s approval
Before cutting a trial batch, specify the length datum, allowed end form, visual edge condition, permitted marking, part identity and the point at which the blank is accepted. Inspect one first-off part after setup, then a part after a normal changeover. If the project needs post-bend trimming, compare against the formed-component datum and the assembly fit. Keep saw-cut acceptance separate from bending, welding, coating and final rack approval.
The rack designer retains compatibility decisions for wheel, brake, frame eyelet and luggage interface, along with structural testing and load claims. A saw trial can confirm that sampled blanks meet the agreed cut specification. It cannot certify a completed rack for use on a bicycle. Product examples and their published ratings must not be transferred to a new design.
7. Compare quotes at the same delivered stage
Compare three realistic routes: finished approved rack, prepared cut or formed member kit, and in-house cutting of long stock. For the kit route, include identifying each member, first-off inspection, rejected parts, protection, packing and delivery. For the in-house route, include stock receipt, fixtures, changeover, handling, inspection and the forming or joining work that still follows. A price per raw saw cut is not directly comparable with a price per accepted, labeled assembly kit.
Ask bidders to list what is excluded: contouring, drilling, bending, welding, anodizing, assembly or test approval. A lower cut price may move substantial work to the buyer. A higher kit price may include work the buyer otherwise must fund. Use the same released drawing revision, member mix and acceptance stage when comparing alternatives.
What to send with the rack cutting inquiry
- The approved rack assembly and a component-stage cut schedule with part numbers and revisions.
- Actual aluminum stock sections, supplied form and finish condition for each retained cut job.
- The straight blank length or post-form trim datum, end geometry and left/right orientation.
- Representative longest, shortest and hardest-to-hold samples, including mating parts if fit matters.
- The planned bending, joining, drilling and coating handoffs and who owns each operation.
- Batch quantities, product variants, first-off check, acceptable edge and surface condition, and labeling rules.
- The exact output stage to compare: raw blanks, accepted cut kit, formed members or complete rack.
The Jiurun video below shows general industrial aluminum cutting equipment. It does not show rack tubing, this article’s selected configuration, a customer project, an accepted rack sample or a load test. Use it to discuss the cutting process, then require a representative trial on your own released material.
For the broader make-or-buy question across bicycle components, see our bicycle manufacturing saw-scope guide. If your job is a vehicle-mounted bicycle tray, use the separate bike carrier tray guide. For a rear luggage rack, send the straight-blank schedule, sample tube and downstream route through the JiurunCut inquiry form. We can review a suitable aluminum cutting process against those actual parts; your product team retains rack design and use approval.